PVE 2.50% 4.1¢ po valley energy limited

0.7mmcf/day, page-8

  1. 1,539 Posts.
    lightbulb Created with Sketch. 5
    The last Bezzecca update:
    The two-well production plan will access a revised 2P reserves estimate of 3 bcf. Combined production rates from the two Bezzecca wells is expected to be about 2 million cubic feet per day

    But the second Bezzecca well isn't scheduled to be drilled till 2014 (which means it will happen in 2015)... if we assume the single well production will be 1 mmcf/day, that's not going to get us from $3m pa to $10m pa.

    Sant'Alberto is the field I'd like to see come online. That or something coming of one of the oil plays...
 
watchlist Created with Sketch. Add PVE (ASX) to my watchlist
(20min delay)
Last
4.1¢
Change
0.001(2.50%)
Mkt cap ! $47.51M
Open High Low Value Volume
4.0¢ 4.1¢ 4.0¢ $3.821K 94.27K

Buyers (Bids)

No. Vol. Price($)
2 82777 3.6¢
 

Sellers (Offers)

Price($) Vol. No.
4.1¢ 262041 1
View Market Depth
Last trade - 12.10pm 12/07/2024 (20 minute delay) ?
PVE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.