30 September 2010
Kingaroy, Queensland
The construction and commissioning of the Kingaroy pilot plant was completed in March 2010. Ignition on site took place on 15 March 2010, and the gasification of coal commenced shortly thereafter. A subsequent shallow failure of well casing in one of the two production wells being used in the process (P4) led to the temporary closing down of the gasification process. The cause of the failure was identified and re-design work was undertaken to ensure a failure of this nature would not recur.
http://hotcopper.com.au/post.asp?fid=1&pid=7591685&tid=1636932&msgid=9422806&rtype=post
- Forums
- ASX - By Stock
- CXY
- hotcopper member rang brad
hotcopper member rang brad , page-25
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CXY (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
SER
STRATEGIC ENERGY RESOURCES LIMITED
David DeTata, Managing Director
David DeTata
Managing Director
SPONSORED BY The Market Online