-
Share
1,477 Posts.
1
12/01/12
01:40
Share
Agree Spondooly
but I think the wire logs must
have jammed or something
otherwise we could have had our
result by now,
and having to call in a clearing
utility re-dril of the already hole,
..well
" log must have been a jam problem." IMO
this way is costly but more accurate,
ADX hanging around on site for 4 months
after the hole is complete..
........must be a odds'on flow! IMO
Spoke to VIL about a plan B' (some time back)
There is one,! (IMO'I think GGP are involved)
"was told dont worry"
-