SDL 0.00% 0.6¢ sundance resources limited

quarterly highlights

  1. 317 Posts.

    Hi Guys

    I just want to point out the highlighs and my personal analysis of this quarterly:


    Sundance and Hanlong executive management attended a number of meetings together during the Quarter
    with senior Government officials of the Republic of Cameroon and the Republic of Congo to demonstrate their
    unified commitment to the development of the Project.

    In undertaking these preliminary works, Sundance has engaged numerous contractors, including local
    companies, to perform the following tasks:
    -  Development of tracks for gaining access to the required areas
    -  Geotechnical and hydrogeological sampling
    -  Bathymetric survey of near shore ocean
    -  Management of the site and contractors to scope, schedule, budget and HSE requirements

    Sundance conducted an expression of interest program for the contract mining and explosives supply and
    handling services

    The first construction works to be conducted at the site will involve the development of access roads, lay down
    areas, a landing ramp and supporting infrastructure at the Lolabe port site area.

    Sundance received from CRCC a tender submission and
    has been involved in evaluation and negotiations with
    CRCC to finalise a contractual arrangement for the
    construction of the railway.  

    CHEC submitted a tender and Sundance is currently in
    the evaluation and negotiations process with CHEC to
    finalise a contractual arrangement for the
    construction of the Lolabe port.  

    Itabirite Resource: 1.5-2.5 Billion Tonne Exploration Target at Nabeba,The exploration program is
    expected to significantly increase the Company’s global Itabirite Resources.

    Republic of Cameroon:The purpose of these holes was to
    intersect the waste material of the
    proposed supergene pit, specifically
    within the schist embayment, with
    the aim of increasing the
    understanding of the mechanics of
    the rock mass and assess the
    possibility/risk of steepening the
    pit wall angle


    It appears that Sundance is progressing toward mining in the very nearest future.

    Hanglong involved in the political level only, the rest is carried by sundance only.

    I would argue here that if hanglong was in the driver seat, it would not allow sundance to be in charge in dealing alone with CRCC and CHEC and selecting private contractor for lolabe site and supply contractor for explosives.

    Note at the cameroon project: The purpose of these holes was to intersect the waste material----> is this part of the scheme. I DO NOT THINK SO.

    Further drilling in south nabeba is intensifying is showing a very strong Fe% results. i would say NO BUT THANKS HANGLONG.

    As per an article on the 2nd of JAN, it is becoming more likely that CRCC and CHEC will be builder operator.

    I am becoming a huge believer of this company and i hope and the rest of the shareholders do feel the same.

    Hang on there guys, the reward is not far away.


    Cheers
 
watchlist Created with Sketch. Add SDL (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.