Another brilliant post bigstar,
I see the capex for ridley is considerably higher @$2.7 bil for a 15 mtpa project, as opposed to Mt Bevan at only $1.5 bil for 10 mpta.
So that could be why AGO want a partner for it instead of selling it outright. They need the cash to develop but still want to retain some of the asset.
- Forums
- ASX - By Stock
- LCY
- lcy: future low cost magnetite producer
lcy: future low cost magnetite producer , page-22
Featured News
Add LCY (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $126.4M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LCY (ASX) Chart |
Day chart unavailable
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
Previous Video
Next Video
SPONSORED BY The Market Online