re: Ann: Twin Hills Operations and Production... Patience is needed. Stack the third heap, irrigate and in 6 or so weeks we are in full production. Ramp up means that. Irrigation takes its time and the more rain means dilution to the cynide which may mean more treating. We cant control the weather and I would not suggest building a massive roof over the heaps. 3100 oz per day has been achieved with 2 pads, and over 4000 oz once the 3rd comes on line. Cant be too dissappointed.
Just wondering if production is a 7 day a week rate? At 15-20 dollars per oz(prod costs) the numbers are starting to look really nice imo. Just hope the rain stays away, pos continues north, aussie $ continues south, exploration keeps giving great results etc etc.
Good luck to all
- Forums
- ASX - By Stock
- AYN
- Ann: Twin Hills Operations and Production Update
Ann: Twin Hills Operations and Production Update , page-26
-
- There are more pages in this discussion • 45 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AYN (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, Managing Director & CEO
Charles Armstrong
Managing Director & CEO
Previous Video
Next Video
SPONSORED BY The Market Online