cut out all this crap chat.
I spoke to a #E Siesmic guy and I found out everything CTP would have need to know in 15 seconds. Here it is
100 sq km @ 25,000/km
mobilisation $500,000
total cost about $3,000,000M for 100 sq km.
essential to do 3D because need anti-clinal structures unfortunately echelon fractures are a problem, usually on a 500 m spacing more or less depending on rock properties.
(Imagine an underground ridge - where oil collects and where rock fractures are opened up - chopped up like salami into 500 m sections and then each piece translated horizontally)
Therefore, need 3D and can guarantee where to drill to get maximum value and flow from drilling.
I found that out in 15 seconds. So what the (expletive) are they doing?
- Forums
- ASX - By Stock
- CTP
- what has been done since 13 january
what has been done since 13 january, page-14
-
- There are more pages in this discussion • 50 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTP (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $39.22M |
Open | High | Low | Value | Volume |
5.4¢ | 5.4¢ | 5.2¢ | $11.95K | 228.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 531813 | 5.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.4¢ | 779964 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 531829 | 0.052 |
3 | 1553712 | 0.051 |
2 | 3001200 | 0.050 |
2 | 400000 | 0.049 |
3 | 50520 | 0.048 |
Price($) | Vol. | No. |
---|---|---|
0.054 | 779981 | 2 |
0.055 | 150000 | 1 |
0.056 | 19995 | 1 |
0.057 | 132936 | 1 |
0.058 | 172431 | 1 |
Last trade - 13.21pm 30/08/2024 (20 minute delay) ? |
Featured News
CTP (ASX) Chart |
The Watchlist
1CG
ONE CLICK GROUP LIMITED
Mark Waller, MD
Mark Waller
MD
SPONSORED BY The Market Online