re: excellent oil and gas find *dst* to be run Yes many of us value Ian's remarks. By my reading as well of the latest announcement a DST is certainly happening on this one :-
"Time of Report: 06:00 hours (CST) 08 July 2005
Well Depth: 2710 m
Current Operation: Running in hole to conduct DST 1 (Patchawarra Fm).
Forward Operations (and Remarks): Cut and recovered Core 1 (18 m) which evaluated as programmed the mid Patchawarra Fm sandstone reservoir. Currently running in the hole to conduct DST 1 across a 5 m interval of sandstone intersected in the base of Core 1.
Following DST 1, run in the hole to cut Core 2 to evaluate as programmed the Tirrawarra Sst reservoir. The Tirrawarra Sst was tested in Flax 1 and flowed oil and gas at approximately 600 bopd and 1.1 MMcfd respectively."
- Forums
- ASX - By Stock
- ACN
- wheels have fallen off
wheels have fallen off, page-26
-
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)