Yes Pottermore the gas price is per Mcf (1000 cubic feet).
So on initial flowrates at Arrowsmith-1 (4 MMcfd) it would have produced at around $34,000/day or $12.4 Million/year. Which is a very nice income from 1 well.
I and probably everybody else on here will be expecting at least double that from a horizontal fracking and then where does it stop? Surely on any success they will be planning a whole field development.
- Forums
- ASX - By Stock
- NWE
- economic production levels
economic production levels, page-2
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NWE (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online