BPT 0.00% $1.28 beach energy limited

w hy big sellers about ?, page-16

  1. 327 Posts.
    I think the cost differential is mainly due to the infrastructure already being in place in the US as noted in an article in The Australian yeterday.

    On top of having a cheap source of gas, US LNG plants are 40-50 per cent cheaper to build than a new project in Australia.

    An existing pipeline network takes the gas to new plants, and disused LNG import terminals provide storage and wharf infrastructure.


    http://www.theaustralian.com.au/business/mining-energy/gas-glut-in-the-us-blasts-gladstone-growth-plans/story-e6frg9df-1226326219242
 
watchlist Created with Sketch. Add BPT (ASX) to my watchlist
(20min delay)
Last
$1.28
Change
0.000(0.00%)
Mkt cap ! $2.920B
Open High Low Value Volume
$1.30 $1.30 $1.28 $13.63M 10.59M

Buyers (Bids)

No. Vol. Price($)
12 170242 $1.28
 

Sellers (Offers)

Price($) Vol. No.
$1.29 141589 6
View Market Depth
Last trade - 16.10pm 26/08/2024 (20 minute delay) ?
BPT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.