"I would have thought that the DTM was based around the 14.7 million l/b M & I and the revised PFS would actually enhance the project economies of scale when they take into consideration the Vanadium credits and a higher cut off grade of U 308 based on recent drilling success"
MMM - I have previously posted that I think it very odd that PEN has made a DTM prior to the release of the revised DFS. Your comment that "the DTM was based around the 14.7 million l/b M & I" appears true, but WHY?
What has happened since late December - when the EES Study made it very clear that the feasibility parameters included 23m lbs of M&I resource? Why has the hurdle, apparently, been reduced so significantly to 14.7m lbs? What parameters and criteria support this?
It looks like the resource is there but - for a bankable feasibility study - there has to be conversion. In other words, inferred resources are too unreliable for bankable fesibility requirements.
The upcoming optimisation study has many questions to answer, imo
- Forums
- ASX - By Stock
- PEN
- permit to mine
permit to mine, page-6
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PEN (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.9¢ |
Change
0.001(1.02%) |
Mkt cap ! $315.5M |
Open | High | Low | Value | Volume |
10.0¢ | 10.3¢ | 9.6¢ | $1.073M | 10.89M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
25 | 305840 | 9.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.0¢ | 2120280 | 19 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
24 | 334646 | 0.098 |
14 | 1106021 | 0.097 |
10 | 1225205 | 0.096 |
14 | 1104316 | 0.095 |
7 | 2935639 | 0.094 |
Price($) | Vol. | No. |
---|---|---|
0.099 | 2156 | 2 |
0.100 | 2075214 | 16 |
0.105 | 9498190 | 55 |
0.110 | 3966413 | 42 |
0.115 | 3752946 | 26 |
Last trade - 14.37pm 14/10/2024 (20 minute delay) ? |
Featured News
PEN (ASX) Chart |