KAB 0.00% 0.1¢ kaboko mining limited

Ann: Processing Plant Design Finalised for Emmanu, page-65

  1. 5,657 Posts.
    lightbulb Created with Sketch. 4
    re: Ann: Processing Plant Design Finalised fo... My mate just got back to me. I asked about the 3-4 months.

    "man by the looks of it it is quite a large job with loads of control wiring, I would be surprised it could be done in 3 to 4 months in total, let alone but **** Africa?

    You can do with that as you will.
 
watchlist Created with Sketch. Add KAB (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.