I believe the Service Rig is a smaller/lighter unit as it will be only involved in completion, fraccing and flow testing..
I would presume that the delay in mobilizing the Service Rig is mostly a form of "operational insurance"(?), against having the Rig on "Downtime", (costly AND unproductive) in the event of Rig 918 having unplanned downtime,or,in the HIGHLY UNLIKELY event of the first two wells being
rated as unproductive,
and consequently not worth fraccing..Only a guess on my part...
All hydrocarbon shows in the vertical sections of both wells and in the horizontal section of B-2 have been most encouraging..
- Forums
- ASX - By Stock
- CND
- drilling operations recommence at macintyre 2
drilling operations recommence at macintyre 2, page-3
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CND (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.4¢ |
Change
0.001(3.03%) |
Mkt cap ! $19.76M |
Open | High | Low | Value | Volume |
3.3¢ | 3.4¢ | 3.3¢ | $819 | 24.83K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 4518 | 3.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.5¢ | 201655 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 4518 | 0.033 |
2 | 246172 | 0.032 |
4 | 2197954 | 0.031 |
2 | 186000 | 0.030 |
2 | 1200000 | 0.029 |
Price($) | Vol. | No. |
---|---|---|
0.035 | 201655 | 2 |
0.036 | 191451 | 4 |
0.037 | 792221 | 2 |
0.038 | 100000 | 1 |
0.039 | 203948 | 2 |
Last trade - 12.13pm 27/09/2024 (20 minute delay) ? |
Featured News
CND (ASX) Chart |