I believe these are the 10 wells we are trying to jointly develop. ;)
Exploratory drillings in the area took place between Mt. Sibayak and Mt. Pratektekan. Pertamina drilled 10 wells in the Sibayak field from 1991 to 1997, comprising 7 production wells (SBY-1, SBY-3, SBY-4, SBY-5, SBY-6, SBY-7 and SBY-8) and 3 reinjection wells (SBY-2, SBY-9 and SBY-10). The reservoir temperature ranges between 240 and 300°C, and pressure varies between 45 and 110 bar-g. Most of the wells are non artesian with pressure at the wellhead in shut-off conditions. The enthalpy of the reservoir reaches 1100 kJ/kg and the maximum wellhead pressure is 21 bar-g in flowing conditions. Steamflow from the production well achieves 51.4 kg/s at 9 bar pressure
At present in the Sibayak geothermal field, a 2 MWe mono-block turbine is installed to produce electricity with steam supplied from well SBY-5. Pertamina is committed to expand the capacity by replacing the 2 MWe monoblock turbine with a 10 MWe condensing turbine. This paper will briefly describe how the electrical power generation can be maximized in the Sibayak geothermal field by using wells SBY-3, SBY-4, SBY-5, SBY-6 and SBY-8 as production wells to supply steam to the power plant.
7 production 3 injection. proven current reserves of 39mwe and resource estimated to be as high as 170mwe
T = down-hole temperature in oC and O = well output in ton/hr
SBY-1 T=243, O=18
SBY-2 T=104, O=?
SBY-3 T=272, O=26
SBY-4 T=272, O=23
SBY-5 T=284, O=57
SBY-6 T=270, O=33
SBY-7 T=266, O=20
SBY-8 T=270, O=35
SBY-9 T=236, O=?
SBY-10 T=170, O=?