The main DST focused on the Upper Cenomanian (UC-1C) gas reservoir (over the interval 2632.9-2666.6 mMDRT), successfully achieving an average flow rate during a ten hour period of 17.5 mmscfd gas through a 44/64” choke, with a flowing wellhead pressure of 1470 psia.
This all happened on the 12th of July but it took them until the 18th to tell us, make up your own minds.
This will be my last post on RIA, good luck guys.
- Forums
- ASX - By Stock
- RIA
- does anyone trust management?
does anyone trust management?
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)