The 4 intervals in that reoprt have an average thickness of 6.5m which my rough calculations are based on a 5m thick section on average. At 5m thick this will have its head in front of RUM on tonnage, if the average is around 6m we could easily add another 20% to the 264m tonne estimate i have.
interesting days ahead