This from 27th.
"The final stage of the Arrowsmith-2 hydraulic fracture stimulation campaign will be a 42m interval at the base of the Kockatea Shale formation. This frac will be conducted at the conclusion of the Carynginia flow back and testing period"
Today
"Preparations" for Stage 5 of the program are now underway – hydraulic fracture stimulation of the Kockatea Shale over the interval 2639 – 2681m.
"Current" status is that the well is continuing to consistently produce gas and return injected fluids to surface under its own energy.
So I believe they are waiting to the last minute to conduce the flow test to give max clear up time.
Add to My Watchlist
What is My Watchlist?