SBR 0.00% 1.2¢ sabre resources limited

Ann: Drilling Success Continues at Guchab , page-3

  1. 3,206 Posts.
    lightbulb Created with Sketch. 95
    look at the pic. it says it all!!!

    in my lay terms:

    hole 1 - went right into the mineralised zone. and would have cotinued beyond 110 meters if they drilled further.
    hole 2 - hit the end zone, hence stopped at 65m
    hole 3 - this will be less than hole 2 as it hits the end zone earlier.
    holes 4&5 - this is inbetween 1 and 2 and will result in much longer interesections.

    so 4&5 are the ones to look out for. although these will not give the full extent as the need to drill along hole1 for much longer to get the entire zone.
 
watchlist Created with Sketch. Add SBR (ASX) to my watchlist
(20min delay)
Last
1.2¢
Change
0.000(0.00%)
Mkt cap ! $4.715M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 153846 1.3¢
 

Sellers (Offers)

Price($) Vol. No.
1.4¢ 129108 2
View Market Depth
Last trade - 16.12pm 11/09/2024 (20 minute delay) ?
SBR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.