As always the annual report only covers up until 30.06.2012, and as advised in my initial posts on this matter, the repayment to Range Resources was made AFTER this date, so obviously as shown in the CCC Annual Reports the terms of the loan, repayment date have been revised as the repayment was made after the original agreed repayment date of 30.06.2012, and CCC Annual reports shows the revised date to reflect the matter of fact, of the delayed repayment to Range.
Cheers jamit01
RRS Price at posting:
7.6¢ Sentiment: ST Buy Disclosure: Held