Results should start flowing in soon - just realised that these diamond rigs are "killing the pig".
I estimate the rig that has drilled the three corker holes must be averaging well over 50m a shift or +100m a day as it drilled at least 750 metres for holes 39 and 41 in seven days. If you add in hole surveys and other assorted downtime which always happens that is a pretty good metre rate.
Good luck to all
- Forums
- ASX - By Stock
- SIR
- more fantastic news today ...
more fantastic news today ..., page-44
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)