jorc and drill results, page-2

  1. 5,753 Posts.
    lightbulb Created with Sketch. 322
    Assuming that was the last ann to be included in maiden JORC (490 holes completed out of 789, which gives an overall average depth of 18.47 metres), and an SG of 2.33 (which is half way between the 2.25 and 2.41 quoted by the Co a few weeks back), I get 401Mt (at 40% Fe).

    Applied to the overall drill target area of 15sq km (789 holes, to be drilled and analysed Q4), that would be 645Mt.

    Applied to the overall plateau lease held (84sq km), that would be 3.6Bt.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.