*4000ft Horizontal well successfully drilled in Colorado
*Drilling fluids continue to flow-back to surface at Birch # 3 well in Texas
*Plans to drill Cooper Basin PEL 105 well with Beach Energy (Operator) have begun
On point 2, they have 50,000 barrels of drilling fluid to flow-back under natural pressure. A lot compared to what some expected?
- Forums
- ASX - By Stock
- AKK
- september operations report
september operations report
-
- There are more pages in this discussion • 30 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)