Hi Gilbert was supposed to have been contracted and slotted to be drilled within 3 months from the prospectus date (2004 ) I am sure that it should be drilled after this well for BPT and Anzon is completed Cheers Towie
GOP Price at posting:
0.0¢ Sentiment: None Disclosure: Not Held