sb at the depths and pressure and temp that the slotted liner is being cemented dont think fractures would be an issue. If the geology is ok..the pressure and temp should help any flow.The issue is if the bore hole will hold and not clog the liner.
MEO Price at posting:
24.5¢ Sentiment: Buy Disclosure: Held