The motor issue could also be caused by low voltage supply.
Output required stays the same so any drop in voltage requires an increase in current = possible overheating of windings.
It could also be a cooling problem (ie. bad design).
At least they can still run at 50%, so whatever they have been producing can continue, until the new motor arrives.
They could probably run the motor at more than 50% but are being prudent. No point taking a risk in burning out the motor.
Cashflow will no doubt be an issue, but I'm sure they'll be able to renegotiate terms with MacQuarie (for the hedging). TGZ were able to do this when they had short term cashflow problems.
- Forums
- ASX - By Stock
- AAU
- update on las lagunas project
update on las lagunas project, page-56
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AAU (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.422M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
78 | 70767639 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 47168386 | 29 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
78 | 70767639 | 0.003 |
51 | 68525069 | 0.002 |
16 | 70979950 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 47168386 | 29 |
0.005 | 16701781 | 11 |
0.006 | 9227660 | 9 |
0.007 | 1222584 | 3 |
0.008 | 4700000 | 4 |
Last trade - 09.59am 11/10/2024 (20 minute delay) ? |
Featured News
AAU (ASX) Chart |
Day chart unavailable
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham, MD & CEO
James Graham
MD & CEO
Previous Video
Next Video
SPONSORED BY The Market Online