Hi ya
Thanks for that. I suppose I was seeking to better understand why report 237m reservoir in the baong sands but only production test 150m interval?
To put that question into context, have lower secondary level drilling issues adversely impacted the length/size/quality of the baong sands to undergo production testing?
This
ADL