TOE toro energy limited

the extra information required

  1. 16,765 Posts.
    lightbulb Created with Sketch. 1680
    Just saw what extra information was required. I would have thought the questions raised were fairly standard stuff.
    Firstly why the hell didn't they ask these before. It looks like clear:
    1 Incompetence
    2 Direlection of duty
    3 lack of attention/lasiness/ inability to understand infromation presented /

    Most appeared to be covered in slide presentatiosn earlier.
    As to the venturing awnsers What if these a deluge? Well the standard design characteistics and tailings dams etc apply. Plus bunded/runoff areas.

    Same with depth of burial of tailing. Well the radioactive bits the U is being taken out!

    The minister should be called out on Christmas day to go over stuff he should have already paid attention to. However he wouldn't undertand and would need it repeated so better not waste everyone time. IT's just like the Collins Class subs (ships they hardly submerge).
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
19.5¢
Change
0.000(0.00%)
Mkt cap ! $23.45M
Open High Low Value Volume
19.0¢ 20.0¢ 19.0¢ $9.905K 49.92K

Buyers (Bids)

No. Vol. Price($)
1 51839 19.0¢
 

Sellers (Offers)

Price($) Vol. No.
20.0¢ 32764 1
View Market Depth
Last trade - 15.29pm 16/07/2025 (20 minute delay) ?
TOE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.