NSE 0.00% 0.4¢ new standard energy limited

drilling contract terminated, page-35

  1. 5,991 Posts.
    lightbulb Created with Sketch. 21554
    Persistentone

    Yes, the pattern on chart is telling the same thing (Jan. 10 and 11)

    One more point, the drill pipe stuck incident must be happened on Jan.16 or 17th. The sp was still around 31c-32c at that date.

    Because the depth was 2700m at noon on Jan.15, then the depth was 2900m when the drill pipe stuck incident happened, they drilled only 200m after noon of Jan.15.

 
watchlist Created with Sketch. Add NSE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.