Sorry Lando. Thought that was a given!
KML owns Karara, which also owns the infrastructure.
Debt is abot 1.789 billion in KML.
GBG own 50% of KML, Ansteel own 50% of KML.
Total cost of the infrastructure is about 2.7 billion. Some of that debt includes 'working capital' which isn't part of the infrastructure cost, but is still required to run the mine - ie dig it up, salaries and wages etc.
- Forums
- ASX - By Stock
- GBG
- real cost per ton
real cost per ton , page-9
-
- There are more pages in this discussion • 30 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)