    The processing plant has been designed to cater for 5 to 7 per cent copper in the early mining years.

    The decision to design a processing plant for a much higher grade {5 to 7 %] than the JORC figure would not have been done lightly but only after very careful consideration. Specific parts of the plant have been designed for that purpose.


    The video "There is something very big under there " on the CuDeco website gives the guide to the explanation regarding the native copper nuggets .

    The large bulk sample of diamond drill cores tested in Western Australia revealed nuggets incapable of going up the smaller RC spout.

    As Wayne McCrae explains in the video "There is something very big under there ",it would have been preferable to have done all diamond drilling to get the truer results but that was not evident until the testing was done in Western Australia and much of the drilling had already been done with RC.

    Calculations for the JORC are from the better source diamond driling and the not so good source RC drilling.

    The weather is an important factor in the ongoing drilling program and the weather gods have been smiling on Wayne with the sunny weather continuing.

    I am looking forward to further drilling results from Rocklands South as Wayne drills further along the line of the new discovery.





 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.