daytrading april 24 morning, page-53

  1. 724 Posts.
    lightbulb Created with Sketch. 24
    GGP

    Ann
    Production and Drilling Report
    following production and drilling update from the Company’s Projects for the two-week
    period, 1st to 15th April, 2013.

    - SRH #1 (2) - -
    - SRH #2 (2) - -
    - SRH #3 (2) 351.6
    - SRH #4 (2)* 402.6
    Napoleonville
    - Dugas LeBlanc #3 431.0
    Bowtie West
    - Sugar Valley #1 155.0
    Total for Period and Cum. (BOE) 1,340.2
    * Hole in tubing occurred near the end of the period.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.