The current mining schedule indicates that 90% of the total material moved from the combined Duckhead starter pit, currently at 98,000 ounces gold with no allowance for these extreme infill grade results, can be mined over a 5 month period, with the remaining 10% completed within the 6th month. This 400,000 tonnes of gold ore will be blended into the Company’s planned 2.3 million tonnes of gold ore to be processed in the last 7 months (Jun – Dec) of 2013
That would be well in excess of any assumptions that I have made... huge
BDR Price at posting:
72.0¢ Sentiment: Buy Disclosure: Held