I spoke to management and that is correct
The current drill is not expected to intersect the Birsa formation, given its positioned relatively down dip.
Not sure PSi why it was positioned to not intersect the Birsa, possiblty the current location is targetted to expose optimal thickness of Aboid.
top drive is fixed and they are drilling ahead, next stop will be the trasitional/shale zoen on top of the Aboid. After which they will cement use a smaller drill piece and drill through to TD. Post which a horizontal will be run then flow tested.
The real action shoudl be 1st 2nd week June through the Aboid, hopefully oil shows in cuttings.
Encouragingly, the logs to date marry up with the seismic lest hope this continues to occur all teh way through