Re: Insurance
Gotta run but for a quick and dirty explanation. Amount received and duration taken to receive funds will be affected be investigations to determine if tailings dam design specification met the conditions, whether the dam was built to specification, whether the dam was operated as per design instruction, any agreed upper limit in claim amount (RED), whether the build cost of the new dam was included in the insurance or just environmental damage associated with failure, terms of or even the presence of any business interruption insurance + a million more things
- Forums
- ASX - By Stock
- RED
- ann out - sienna update
ann out - sienna update, page-37
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)