ETR 0.00% 0.7¢ entyr limited

Ann: Atzam 4 - Project Update , page-59

  1. 5,710 Posts.
    lightbulb Created with Sketch. 470
    It's all speculation about RRS and we should focus on getting our part done with is production and drilling Atzam5. The confidence on the Atzam project increases significantly. If the well testing takes this kind of time frame, we can think of a larger reservoir than expected, which can take longer for the pressure to respond. We should attend the GM either in persons or on the teleconference, if we are responsible shareholders small or large. I cling towards a sizeable reserves/resources as well as relatively good production per well for a junior.
 
watchlist Created with Sketch. Add ETR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.