CFU 0.00% 0.4¢ ceramic fuel cells limited

free bluegen install for uk pubs, page-8

  1. 28 Posts.
    Capital Outlay = FIT for 10yrs @ 12.5p/Unit = £16,425.00 + Inflation

    Savings in Electricity if all the Electricity is used from the Bluegen= Approx £750.00 per yr

    In the above case, no electricity would be exported but as regards PV, 50% of the generated electricity at 4.5p/Unit is paid anyway even if you do not export any. The reason being that no export meters are installed so therefore an estimate.

    If it was the same for MCHP then £295 could be added to the £750.00