284m @ 1.2g/t Au from 292m – 576m o Including: 104m @ 1.6g/t Au from 292m – 396m o Including: 50m @ 1.9g/t Au from 300m -350m • Initial Mt Adrah Hobbs Pipe 1 assays received within expected range, confirm company’s concepts and targets • These results provide a clear picture of the grade of mineralisation to 576 metres • Assay results from the rest of the hole, 0m - 284m and 576m to 1,029.6 metres, are pending and will be reported as received, potentially extending the mineralised intercept to beyond 600m