soc
284m @ 1.2g/t Au from 292m – 576m
o Including: 104m @ 1.6g/t Au from 292m – 396m
o Including: 50m @ 1.9g/t Au from 300m -350m
• Initial Mt Adrah Hobbs Pipe 1 assays received within expected range, confirm
company’s concepts and targets
• These results provide a clear picture of the grade of mineralisation to 576 metres
• Assay results from the rest of the hole, 0m - 284m and 576m to 1,029.6 metres, are
pending and will be reported as received, potentially extending the mineralised
intercept to beyond 600m
- Forums
- ASX - Day Trading
- daytrading july 17 morning
daytrading july 17 morning, page-6
-
- There are more pages in this discussion • 188 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham / Dr Alan Dunton, MD & CEO / Non-Executive Director
James Graham / Dr Alan Dunton
MD & CEO / Non-Executive Director
SPONSORED BY The Market Online