bit of good information i found in the december 10th 2010 release that i didnt know about the rail capacity GBG/Karrara have.
copy and pasted from the release.
"Some of the key areas where infrastructure has been upgraded include:
• An increase in the capacity of the high-voltage power line, from 132kv to 330kv, connecting Karara to the
State grid at Eneabba. This is sufficient to accommodate an ultimate production capacity of more than
36Mtpa;
• Improved rail haulage capacity of the 85km spur line connecting Karara to the existing rail line from
Morawa-to-Geraldton, increasing the capacity of the spur line to +36Mtpa. This line is being built as a dual
gauge to allow conversion from narrow to standard gauge in the future;"
so they can transport up to 36mtpa on the Rail. So at least they have future thought in mind and if MGI(in the future)share their berth/port access like someone mentioned somewhere on the forum yesterday then they could eventually haul in the $ with the High %FE
- Forums
- ASX - By Stock
- GBG
- sentiment
sentiment, page-10
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GBG (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO
Anthony Noble
CEO
SPONSORED BY The Market Online