Lifesgood
This is all about post the award of the EP
You quite obviously have no idea how hard it is to get heritage survey clearance from the Native title holders.
These are need to done before you even cut a seismic line, let alone build an gravel road to a well site.
Have a look at the delays that BRU has had with Ungani 3D seismic survey, and that's when they have the Aboriginals onside.
Now look at OBL and do you think they have a co-operative relationship with them.
Think of delays, delays and new special sites all the time, with OBL involved still once this permit is awarded the time line to do any meaningful exploration activity will be years, look at Santos and the Merrie oil field as an example.
Neil is very ill-advised in forcing the issue, it will come back and bite.
- Forums
- ASX - By Stock
- EMP
- assume dismissed.
assume dismissed., page-7
-
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EMP (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.507M |
Open | High | Low | Value | Volume |
2.2¢ | 2.2¢ | 2.1¢ | $14.53K | 681.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 968848 | 2.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.3¢ | 40000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 968848 | 0.021 |
2 | 1850000 | 0.020 |
5 | 1865045 | 0.019 |
3 | 1727788 | 0.018 |
1 | 1000000 | 0.017 |
Price($) | Vol. | No. |
---|---|---|
0.023 | 40000 | 1 |
0.024 | 566666 | 4 |
0.025 | 1110091 | 2 |
0.026 | 119360 | 1 |
0.027 | 80000 | 1 |
Last trade - 10.35am 07/11/2024 (20 minute delay) ? |
Featured News
EMP (ASX) Chart |