SOC - Announcement -
Hobbs Pipe 1 update
Current width ~70 metres and widening
• Strong sulphide-sericite alteration, an indicator of gold
mineralisation at the Hobbs deposit, is present throughout the Pipe 1 zone
• Down-hole length currently at 680 metres and drilling
ahead to determine northern edge of Hobbs Pipe 1
• Hobbs Pipe 1 width currently ~70 metres at ~630
metres vertical and widening
• Visual observation of core identical to previous vertical
hole GHD001
- Forums
- ASX - Day Trading
- daytrading august 2 pre-market
daytrading august 2 pre-market, page-15
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
TLX
Telix jumps 11.6% as US government indicates proposed medicare changes won't affect prostate cancer drug
RNU
Renascor wins a funding boost given it wants to produce a critical mineral – but $5M award pales in comparison to some