Ann: Galoc Phase II Drilling Update Number 14 , page-2

  1. 9,259 Posts.
    lightbulb Created with Sketch. 747
    Will be an interesting drilling update # 15 as to exactly how much they have managed to drill through with the forward plan to drill a 2400m horozontal in G5H. From here on out i would assume derisking will result in a rise in the SP as long as they do not come across a snag.
 
watchlist Created with Sketch. Add NDO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.