Looks like there will be another CR soon, to fund the drilling.
I posted this back in July.....October Ore Pile. The plan of operation consists of removing this existing low-grade
stockpile of uranium and vanadium ore that sits on approximately one-third of an acre
(0.35 acres). The removal of this low grade uranium and vanadium ore stockpile is a
reclamation project.
"Key word low-grade" but the October Ore will test the 5ton unit.
- Forums
- ASX - By Stock
- BLR
- $2m facility
$2m facility, page-11
-
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)