    I keep posting Bg's deepsea metro progress in the assumption that this rig will drill Pcl,s 10a10b. Their presentation indicates that the Mzia Well No 3 they are just moving too is the last well for 2013 which would indicate they are ahead of schedule. 10a/10b drilling is scheduled for start of 2014.

    No doubt BG could find another target after Mzia No 3 well with an extraordinary strike rate and prospects in Tanz.

    Maybe the deepsea metro needs "a break" maybe back in Capetown for annual maintenance before Jan 2014??

    either way 10a/10b looking like it is on time at least if not early??
 