AAU 25.0% 0.5¢ antilles gold limited

Ann: Quarterly Report and Appendix 5B , page-13

  1. 132 Posts.
    More likely that the weld failures are due to poor design , the engineer(s) who designed the agitators may have under specified the type/size/quantity of welds required to cope with the maximum power output of the motors, or not provided enough bracing to the blades
 
watchlist Created with Sketch. Add AAU (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.001(25.0%)
Mkt cap ! $7.307M
Open High Low Value Volume
0.5¢ 0.7¢ 0.5¢ $210.7K 34.56M

Buyers (Bids)

No. Vol. Price($)
25 17436326 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 1341261 3
View Market Depth
Last trade - 16.10pm 13/09/2024 (20 minute delay) ?
AAU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.