daytraders after market lounge 23rd oct, page-37

  1. 22,120 Posts.
    lightbulb Created with Sketch. 20
    Reading WAS's latest update and the action out of the UK makes me think this going a lot higher once the market realises this isn't some BS stock getting pumped but rather a proper energy player gaining traction

    They've got on in the UK how long before Aussie investors catch on

    Hope I can get some more at 0.8 in the am

    "Under construction and commissioning Kalina Cycle® Power Plants
    In conjunction with FLSmidth, a leading global cement and minerals processing engineering group, Wasabi Energy has three Kalina Cycle® power plants currently undergoing commissioning at the DG Khan cement facility, Pakistan (8.75 MWe), with Star Cement in Ras Al Khaimah, U.A.E (4.75 MWe) and a 50 kWe Ecogen unit at Matsunoyama, Japan. Concurrently with the commissioning of these three plants, Wasabi Energy is overseeing the construction of three Kalina Cycle® power plants (including a 4 MWe waste heat to power plant at the Hainan Petrochemical Facility, China) with a combined output of approximately 10 MWe. Due to rising electricity tariffs, scarcity of electricity and mandates for energy efficiency and renewable power, Kalina Cycle® technology is increasingly being selected as one of the most effective ways of controlling costs and creating additional, emission free electricity."
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.