AWE quarterly just released - see below in regards to Arrowsmith:
exploration permit EP413 (AWE 44.25%), operations
at the Arrowsmith-2 well resumed in late August and
testing is expected to continue for the remainder of
calendar year 2013. The well was recompleted using
2 3/8 inch tubing, which greatly enhanced well clean up
and flow back.
An initial comingled gas flow rate of 3.5 million scf/d
was recorded on 18 September, and the well averaged
315,000 scf/d from 19 September to 17 October. The
co-mingled flow back was achieved from the Caryngina
formation, the Irwin River Coal Measures and the High
Cliff Sandstones and was in line with expectations for a
vertical well.
A 3D seismic survey is planned for the area around
Arrowsmith-2 following the completion of the current
phase of testing. The survey and flow test data will
enable selection of the most appropriate zone for the
placement of a possible horizontal well.
- Forums
- ASX - By Stock
- NWE
- quarterly
quarterly
-
-
- There are more pages in this discussion • 33 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
GML
Gateway Mining sells WA Eastern Montague gold project to Brightstar for $14M – half of that in shares
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit