Just having a look at the Geraldton Port website shipping arrivals for the next week. I see that KML seems to have a ship booked to Berth 7 approx every 3 days, with a 24 hr loading time scheduled for each ship. If we can load 10 loads per month for 12 months we have a figure of 7.2 million tonnes. Plenty of patiece needed, but hopefully with the IO price still up and the $AU down there may be a little pinprick light at the end of this bloody long tunnel!!! GLTA.