Adl
The core for B2 was taken from B1 estimated GWC of 3226mMD.
My take was that it would clear up the GWC point physically.
The reasons for drilling to TD of 3425mMD and the length of the core 57m,is only known to ENI.
Fingers crossed for a production test of both the Flamingo and Plover formations.
I have no idea what a GWC of 3226mMD would have to the recovery of gas below it. I guess it will be determined by the amount of water saturation, porosity and a host of other parameters.
It is interesting to note that the temperature is
150deg C plus at the plover formation.
Cheers IFINO
Add to My Watchlist
What is My Watchlist?