MEO meo australia limited

ann out, page-25

  1. 2,041 Posts.
    wireline logs and pressure data would convincingly define the GWC.

    the reason the section was cored was to assess the quality of reservoir sandstones, to determine such features as poor porosity and natural fractures that may improve permeability, therefore recoverability.

    Blackwood-1 came in ~200m high to prognosis . . . however this was an exploration well.

    In contrast, Blackwood-2 had additional wells to use as well-control on the 3D to calibrate formation tops. Therefore the decision to core 60m, then drill another 142m, to below pre-drill planned TD suggests that something kept them interested, even after a cored section that exceeded B-1's reservoir intersection in the Plover.

    we all deserve a good result here - but unfortunately the universe doesn't operate that way.

    Looking good though, lets see.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.